All
All
Sports & Recreation
Health & Wellness
Meat Choppers & Meat Grinders
Decor & Furniture
Pet Supplies
Home Decor
Decor & Furniture
Doors & Windows
Agriculture & Forestry Equipment
Air Tools & Compressors
Alternative & Renewable Energy
Arts & Crafts & Sewing
Automotive
Building & Construction
Cleaning & Janitorial Supplies
Electrical
Engines & Motors
Hand Tools
Hardware
Heating & Cooling
Hydraulics
Lab
Lawn & Garden
Lighting
Machining
Material Handling
Office Supplies
Painting
Plumbing
Power Tools
Pumps
Restaurant & Food Service
Safety
Security
Tool Storage & Organization
Welding
Other
EN
Select the country/region, language, and currency you prefer for shopping.
Country Website
Language
Currency
Submit
Delivery to
Your Address
Hello, Sign in
Account & Order
Categories
Deals
Best Sellers
Clearance
Member Club
Inspiration
Download VEVOR App
Exclusive
AU $5.00
off for your first three orders on the App.
Scan the QR code to download
Home
Hand Tools
Search for "
safe work method statement
"
Clamps & Vises
Vises & Presses
Power Tool Parts & Accessories
Measuring Tools
21 Results
Sort by:
Popular
Popular
Price from Low to High
Price from High to Low
Hot
New
Categories
Hand Tools
Clamps & Vises
Vises & Presses
Power Tool Parts & Accessories
Measuring Tools
Price Discounts
On Sale
Bulk Savings
Stars
5 stars only
4 stars and up
3 stars and up
2 stars and up
1 star and up
Price
Go
Under
30
30
~
50
50
~
100
100
~
200
200
~
500
500
&
Above
In Stock
Quick look
VEVOR Single Horn Anvil, 55lbs Cast Steel Anvil, High Hardness Rugged Round Horn Anvil for Blacksmiths, with Large Countertop and Stable Base, Metal Working Tool for Metal Bending, Shaping, Twisting
(1)
199.99
199.99
Deal after registering
Member discounted price
0% cash back
at checkout.
199.99
Non-PRO Account
199.99
Save
Non-PRO Account
Only 3 Left, order soon
Add to Cart
Quick look
VEVOR Laser Receiver for Laser Level, 60 m Working Range, Green Laser and Red Beam Detector for Pulsing Line Lasers, Adjustable Speaker & Dual LCD Display & Built-In Bubble Level, Clamp Included
(2)
57.99
57.99
Deal after registering
Member discounted price
0% cash back
at checkout.
57.99
Non-PRO Account
57.99
Save
Non-PRO Account
In Stock.
Add to Cart
Quick look
VEVOR Saw Horses, 2 Pack Folding Work Horses, 816.5 kg Load Capacity Sawhorse with Heavy Duty Legs, Adjustable Height Saw Horse with Non-Slip Foot Pads, for Woodworking, Carpenters and Contractors
180.99
180.99
Deal after registering
Member discounted price
0% cash back
at checkout.
180.99
Non-PRO Account
180.99
Save
Non-PRO Account
Only 2 Left, order soon
Add to Cart
Quick look
VEVOR Bar Clamps for Woodworking, 2-Pack 30.48 cm One-Handed Clamp/Spreader, Quick-Grip F-Clamp with 154 kg Load Limit, Premium Plastic and Carbon Steel, for Woodworking Metal working, Orange + Black
(99)
39.99
39.99
Deal after registering
Member discounted price
0% cash back
at checkout.
39.99
Non-PRO Account
39.99
Save
Non-PRO Account
Only 5 Left, order soon
Add to Cart
Quick look
VEVOR Bar Clamps for Woodworking, 2-Pack 60.96 cm One-Handed Clamp/Spreader, Quick-Grip F-Clamp with 154 kg Load Limit, Premium Plastic and Carbon Steel, for Woodworking Metal working, Blue + Black
(99)
44.99
44.99
Deal after registering
Member discounted price
0% cash back
at checkout.
44.99
Non-PRO Account
44.99
Save
Non-PRO Account
Only 4 Left, order soon
Add to Cart
Quick look
VEVOR Bar Clamps for Woodworking, 2-Pack 914mm Clamp, Quick-Change F Clamp with 600 lbs Load Limit, 2.5" Throat Depth, Cast Iron and Carbon Steel, Wood Clamps for Woodworking Metal Working
(99)
38.99
38.99
Deal after registering
Member discounted price
0% cash back
at checkout.
38.99
Non-PRO Account
38.99
Save
Non-PRO Account
In Stock.
Add to Cart
Quick look
VEVOR Bar Clamps for Woodworking, 2-Pack 610mm One-Handed Clamp/Spreader, Quick-Change F Clamp with 300 lbs Load Limit, High-strength Plastic and Carbon Steel, Wood Clamps for Woodworking Metal Working
(99)
49.99
49.99
Deal after registering
Member discounted price
0% cash back
at checkout.
49.99
Non-PRO Account
49.99
Save
Non-PRO Account
Only 5 Left, order soon
Add to Cart
Quick look
VEVOR Bar Clamps for Woodworking, 2-Pack 91.4 cm Opening, Lockable F-Clamp with 272 kg Load Limit,63.5 mm Depth, Cast Iron and Carbon Steel, Easy to Use, Wood Clamps for Woodworking Metal Working
(99)
34.99
34.99
Deal after registering
Member discounted price
0% cash back
at checkout.
34.99
Non-PRO Account
34.99
Save
Non-PRO Account
Only 2 Left, order soon
Add to Cart
Quick look
VEVOR Bar Clamps for Woodworking, 2-Pack 30.48 cm and 2-Pack 15.24 cm, One-Handed Clamp/Spreader, Quick-Grip F-Clamp with 70 kg Load Limit, Premium Plastic and Steel, for Woodworking Metal working
(99)
29.99
29.99
Deal after registering
Member discounted price
0% cash back
at checkout.
29.99
Non-PRO Account
29.99
Save
Non-PRO Account
In Stock.
Add to Cart
Quick look
VEVOR Bar Clamps for Woodworking, 2-Pack 76.2 cm Parallel Clamp Set, F-Clamp with 680 kg Load Limit, Even Pressure, High-strength Plastic and Carbon Steel, for Woodworking Metal Working, Orange
(99)
101.99
101.99
Deal after registering
Member discounted price
0% cash back
at checkout.
101.99
Non-PRO Account
101.99
Save
Non-PRO Account
Out of Stock
Notify Me
Registered
Quick look
VEVOR Saw Horses, 2 Pack Folding Work Horses, 600.1 kg Load Capacity Sawhorse with Heavy Duty Legs, All-Metal Portable Saw Horse with Non-Slip Foot Pads, for Woodworking, Carpenters & Contractors
134.99
165.99
Deal after registering
Member discounted price
0% cash back
at checkout.
134.99
Non-PRO Account
134.99
Save
Non-PRO Account
Out of Stock
Notify Me
Registered
Quick look
VEVOR Saw Horses, 2 Pack Folding Work Horses, 199.6 kg Load Capacity Sawhorse with Heavy Duty Legs, Adjustable Height Saw Horse with Non-Slip Foot Pads, for Woodworking, Carpenters and Contractors
77.99
77.99
Deal after registering
Member discounted price
0% cash back
at checkout.
77.99
Non-PRO Account
77.99
Save
Non-PRO Account
Out of Stock
Notify Me
Registered
Quick look
VEVOR Bar Clamps for Woodworking, 2-Pack 60.96 cm Parallel Clamp Set, F-Clamp with 680 kg Load Limit, Even Pressure, High-strength Plastic and Carbon Steel, for Woodworking Metal Working, Orange
(99)
81.99
81.99
Deal after registering
Member discounted price
0% cash back
at checkout.
81.99
Non-PRO Account
81.99
Save
Non-PRO Account
Out of Stock
Notify Me
Registered
Quick look
VEVOR Single Horn Anvil, 110lbs Cast Steel Anvil, High Hardness Rugged Round Horn Anvil for Blacksmiths, with Large Countertop and Stable Base, Metal Working Tool for Metal Bending, Shaping, Twisting
(1)
405.99
491.99
Deal after registering
Member discounted price
0% cash back
at checkout.
405.99
Non-PRO Account
405.99
Save
Non-PRO Account
Out of Stock
Notify Me
Registered
Quick look
VEVOR Bar Clamps for Woodworking, 2-Pack 91.4 cm Parallel Clamp Set, F-Clamp with 680 kg Load Limit, Even Pressure, High-strength Plastic and Carbon Steel, for Woodworking Metal Working, Orange
(99)
120.99
120.99
Deal after registering
Member discounted price
0% cash back
at checkout.
120.99
Non-PRO Account
120.99
Save
Non-PRO Account
Out of Stock
Notify Me
Registered
Quick look
VEVOR Single Horn Anvil, 25lbs Cast Steel Anvil, High Hardness Rugged Round Horn Anvil for Blacksmiths, with Stable Base, Metal Working Tool for Metal Bending, Shaping, Twisting, Craft Projects
(1)
86.99
95.99
Deal after registering
Member discounted price
0% cash back
at checkout.
86.99
Non-PRO Account
86.99
Save
Non-PRO Account
Out of Stock
Notify Me
Registered
Quick look
VEVOR Single Horn Anvil 132Lbs Cast Steel Anvil Blacksmith for Sale Forge Steel Tools with Round and Square Hole and Equipment Anvil Rugged Blacksmith Jewelers Durable and Robust Metal Working Tool
(377)
542.99
605.99
Deal after registering
Member discounted price
0% cash back
at checkout.
542.99
Non-PRO Account
542.99
Save
Non-PRO Account
Out of Stock
View Details
Quick look
VEVOR Single Horn Anvil 86Lbs Steel Anvil Blacksmith for Sale Forge Steel Tools and Equipment Anvil Rugged Blacksmith Jewelers Durable and Robust Metal Working Tool
(377)
300.99
337.99
Deal after registering
Member discounted price
0% cash back
at checkout.
300.99
Non-PRO Account
300.99
Save
Non-PRO Account
Out of Stock
Notify Me
Registered
Quick look
VEVOR Bar Clamps for Woodworking, 2-Pack 15.24 cm and 2-Pack 30.48 cm, Lockable F-Clamp with 272 kg Load Limit, 63.5 mm Depth, Cast Iron and Carbon Steel, Wood Clamps for Woodworking Metal Working
(99)
34.99
34.99
Deal after registering
Member discounted price
0% cash back
at checkout.
34.99
Non-PRO Account
34.99
Save
Non-PRO Account
Out of Stock
Notify Me
Registered
Quick look
VEVOR Bar Clamps for Woodworking, 4-Pack 91.4 cm Opening, Lockable F-Clamp with 272 kg Load Limit, 63.5 mm Depth, Cast Iron and Carbon Steel, Easy to Use, Wood Clamps for Woodworking Metal Working
(99)
57.99
57.99
Deal after registering
Member discounted price
0% cash back
at checkout.
57.99
Non-PRO Account
57.99
Save
Non-PRO Account
Out of Stock
Notify Me
Registered
Quick look
VEVOR Bar Clamps for Woodworking, 2-Pack 610 mm Opening, Lockable F-Clamp with 272 kg Load Limit, 63.5 mm Depth, Cast Iron and Carbon Steel, Easy to Use, Wood Clamps for Woodworking Metal Working
(99)
28.99
41.99
Deal after registering
Member discounted price
0% cash back
at checkout.
28.99
Non-PRO Account
28.99
Save
Non-PRO Account
Out of Stock
Notify Me
Registered
1
You May Also Like
Today's Deals For You
Recently Viewed
Recommended Searches
electricals
an fittings near me
an fittings
use of wrench
best wrenches
few tools
tool come along
my tools
tools machine
used tools
tools near me
second hand machine
tool machining
must have tools
tools for machines
machine tools machining
when tools
steel cutter tool
strapping tool set
manual brake bleeder tool