All
All
Sports & Recreation
Health & Wellness
Meat Choppers & Meat Grinders
Decor & Furniture
Pet Supplies
Home Decor
Decor & Furniture
Doors & Windows
Agriculture & Forestry Equipment
Air Tools & Compressors
Alternative & Renewable Energy
Arts & Crafts & Sewing
Automotive
Building & Construction
Cleaning & Janitorial Supplies
Electrical
Engines & Motors
Hand Tools
Hardware
Heating & Cooling
Hydraulics
Lab
Lawn & Garden
Lighting
Machining
Material Handling
Office Supplies
Painting
Plumbing
Power Tools
Pumps
Restaurant & Food Service
Safety
Security
Tool Storage & Organization
Welding
Other
EN
Select the country/region, language, and currency you prefer for shopping.
Country Website
Language
Currency
Submit
Delivery to
Your Address
Hello, Sign in
Account & Order
Categories
Deals
Best Sellers
Clearance
Member Club
Inspiration
Download VEVOR App
Exclusive
AU $5.00
off for your first three orders on the App.
Scan the QR code to download
Home
Hand Tools
Clamps & Vises
Search for "
safe work method statement
"
12 Results
Sort by:
Popular
Popular
Price from Low to High
Price from High to Low
Hot
New
Categories
Hand Tools
Clamps & Vises
Bar Clamps
Price Discounts
On Sale
Bulk Savings
Stars
5 stars only
4 stars and up
3 stars and up
2 stars and up
1 star and up
Price
Go
Under
30
30
~
50
50
~
100
100
~
200
200
~
500
500
&
Above
In Stock
Quick look
VEVOR Bar Clamps for Woodworking, 2-Pack 30.48 cm One-Handed Clamp/Spreader, Quick-Grip F-Clamp with 154 kg Load Limit, Premium Plastic and Carbon Steel, for Woodworking Metal working, Orange + Black
(99)
39.99
39.99
Deal after registering
Member discounted price
0% cash back
at checkout.
39.99
Non-PRO Account
39.99
Save
Non-PRO Account
Only 5 Left, order soon
Add to Cart
Quick look
VEVOR Bar Clamps for Woodworking, 2-Pack 60.96 cm One-Handed Clamp/Spreader, Quick-Grip F-Clamp with 154 kg Load Limit, Premium Plastic and Carbon Steel, for Woodworking Metal working, Blue + Black
(99)
44.99
44.99
Deal after registering
Member discounted price
0% cash back
at checkout.
44.99
Non-PRO Account
44.99
Save
Non-PRO Account
Only 1 Left, order soon
Add to Cart
Quick look
VEVOR Bar Clamps for Woodworking, 2-Pack 914mm Clamp, Quick-Change F Clamp with 600 lbs Load Limit, 2.5" Throat Depth, Cast Iron and Carbon Steel, Wood Clamps for Woodworking Metal Working
(99)
38.99
38.99
Deal after registering
Member discounted price
0% cash back
at checkout.
38.99
Non-PRO Account
38.99
Save
Non-PRO Account
In Stock.
Add to Cart
Quick look
VEVOR Bar Clamps for Woodworking, 2-Pack 610mm One-Handed Clamp/Spreader, Quick-Change F Clamp with 300 lbs Load Limit, High-strength Plastic and Carbon Steel, Wood Clamps for Woodworking Metal Working
(99)
49.99
49.99
Deal after registering
Member discounted price
0% cash back
at checkout.
49.99
Non-PRO Account
49.99
Save
Non-PRO Account
Only 5 Left, order soon
Add to Cart
Quick look
VEVOR Bar Clamps for Woodworking, 2-Pack 91.4 cm Opening, Lockable F-Clamp with 272 kg Load Limit,63.5 mm Depth, Cast Iron and Carbon Steel, Easy to Use, Wood Clamps for Woodworking Metal Working
(99)
34.99
34.99
Deal after registering
Member discounted price
0% cash back
at checkout.
34.99
Non-PRO Account
34.99
Save
Non-PRO Account
Only 1 Left, order soon
Add to Cart
Quick look
VEVOR Bar Clamps for Woodworking, 2-Pack 30.48 cm and 2-Pack 15.24 cm, One-Handed Clamp/Spreader, Quick-Grip F-Clamp with 70 kg Load Limit, Premium Plastic and Steel, for Woodworking Metal working
(99)
29.99
29.99
Deal after registering
Member discounted price
0% cash back
at checkout.
29.99
Non-PRO Account
29.99
Save
Non-PRO Account
In Stock.
Add to Cart
Quick look
VEVOR Bar Clamps for Woodworking, 2-Pack 76.2 cm Parallel Clamp Set, F-Clamp with 680 kg Load Limit, Even Pressure, High-strength Plastic and Carbon Steel, for Woodworking Metal Working, Orange
(99)
101.99
101.99
Deal after registering
Member discounted price
0% cash back
at checkout.
101.99
Non-PRO Account
101.99
Save
Non-PRO Account
Out of Stock
Notify Me
Registered
Quick look
VEVOR Bar Clamps for Woodworking, 2-Pack 60.96 cm Parallel Clamp Set, F-Clamp with 680 kg Load Limit, Even Pressure, High-strength Plastic and Carbon Steel, for Woodworking Metal Working, Orange
(99)
81.99
81.99
Deal after registering
Member discounted price
0% cash back
at checkout.
81.99
Non-PRO Account
81.99
Save
Non-PRO Account
Out of Stock
Notify Me
Registered
Quick look
VEVOR Bar Clamps for Woodworking, 2-Pack 91.4 cm Parallel Clamp Set, F-Clamp with 680 kg Load Limit, Even Pressure, High-strength Plastic and Carbon Steel, for Woodworking Metal Working, Orange
(99)
120.99
120.99
Deal after registering
Member discounted price
0% cash back
at checkout.
120.99
Non-PRO Account
120.99
Save
Non-PRO Account
Out of Stock
Notify Me
Registered
Quick look
VEVOR Bar Clamps for Woodworking, 2-Pack 15.24 cm and 2-Pack 30.48 cm, Lockable F-Clamp with 272 kg Load Limit, 63.5 mm Depth, Cast Iron and Carbon Steel, Wood Clamps for Woodworking Metal Working
(99)
34.99
34.99
Deal after registering
Member discounted price
0% cash back
at checkout.
34.99
Non-PRO Account
34.99
Save
Non-PRO Account
Out of Stock
Notify Me
Registered
Quick look
VEVOR Bar Clamps for Woodworking, 4-Pack 91.4 cm Opening, Lockable F-Clamp with 272 kg Load Limit, 63.5 mm Depth, Cast Iron and Carbon Steel, Easy to Use, Wood Clamps for Woodworking Metal Working
(99)
57.99
57.99
Deal after registering
Member discounted price
0% cash back
at checkout.
57.99
Non-PRO Account
57.99
Save
Non-PRO Account
Out of Stock
Notify Me
Registered
Quick look
VEVOR Bar Clamps for Woodworking, 2-Pack 610 mm Opening, Lockable F-Clamp with 272 kg Load Limit, 63.5 mm Depth, Cast Iron and Carbon Steel, Easy to Use, Wood Clamps for Woodworking Metal Working
(99)
28.99
41.99
Deal after registering
Member discounted price
0% cash back
at checkout.
28.99
Non-PRO Account
28.99
Save
Non-PRO Account
Out of Stock
Notify Me
Registered
Related searches
sealed machine
slushi machine
stickers machine
best slushie machine
painting machine
milking machine
bagging machine
best milling machine
pastry machine
shirt machine
capping machine
plucker machine for chickens
fulling machine
sharpening machine
sheeter machine
See more
1
You May Also Like
Today's Deals For You
Recently Viewed
Recommended Searches
pipe vise
fix clamp
clamping tools
wheel clamp
plate clamps
vise clamps vices
milling vise vices
a drill
cnc drilling machine
mill drill
cnc machining near me
best cnc machine
cnc machine near me
used cnc machine
drills
best drill
best drill machine
machine
cnc milling machine
jaw clamp