All
All
Appliances
Automotive
Bath
Building Materials
Cleaning
Doors & Windows
Electrical
Flooring
Furniture
Hardware
Health And Wellness
Heating, Venting & Cooling
Holiday Decorations
Home Decor
Industrial & Scientific
Kitchen
Lighting
Lumber & Composites
Musical Instruments
Other
Outdoors
Paint
Playground Sets
Plumbing
Safety Equipment
Smart Home
Sports & Outdoors
Storage & Organization
Tools
Window Treatments
Workwear
EN
Select the country/region, language, and currency you prefer for shopping.
Country Website
Language
Currency
Submit
Delivery to
Your Address
Hello, Sign in
Account & Order
Categories
Deals
New
Best Sellers
Clearance
Inspiration
Member Club
Download VEVOR App
Exclusive
AU $5.00
off for your first three orders on the App.
Scan the QR code to download
Home
Building Materials
Search for "
safe work method statement
"
Scaffolding
Ladders
Drywall
Material Handling Equipment
24 Results
Sort by:
Popular
Popular
Price from Low to High
Price from High to Low
Hot
New
Categories
Building Materials
Scaffolding
Ladders
Drywall
Material Handling Equipment
Price Discounts
On Sale
Bulk Savings
Stars
5 stars only
4 stars and up
3 stars and up
2 stars and up
1 star and up
Price
Go
100
~
200
200
~
500
500
&
Above
In Stock
Pickup
Quick look
VEVOR Telescoping Aluminum Work Plank, 6-9 Feet 500lbs Capacity, 12.5 inch Width Aluminum Scaffold Plank,Extension Staging Plank with Skid-Proof Platform Scaffold Ladder Accessory
(9)
206.9
206.9
Deal after registering
Member discounted price
0% cash back
at checkout.
206.9
Non-PRO Account
206.9
Save
Non-PRO Account
Almost sold out
Add to Cart
VEVOR Folding Work Platform, 660 lbs Load Capacity, Aluminum Drywall Stool Ladder, Heavy Duty Work Bench w/ Non-Slip Feet, Ideal for Washing Vehicles, Cleaning, Painting, Decorating
(20)
194.9
194.9
Deal after registering
Member discounted price
0% cash back
at checkout.
194.9
Non-PRO Account
194.9
Save
Non-PRO Account
Only 1 Left, order soon
Add to Cart
VEVOR Folding Work Platform, 330 lbs Load Capacity, Aluminum Drywall Stool Ladder, Heavy Duty Work Bench w/ Non-Slip Feet, Ideal for Washing Vehicles, Cleaning, Painting, Decorating
(20)
107.9
107.9
Deal after registering
Member discounted price
0% cash back
at checkout.
107.9
Non-PRO Account
107.9
Save
Non-PRO Account
In Stock.
Add to Cart
MUST
BUY
Quick look
VEVOR Forklift Safety Cage, 544 kg Load Capacity, 92 x 92 cm Folding Forklift Work Platform with Lockable Swivel Wheels, Drain Hole, and Device Chain, Holds 1 to 2 Adults, Perfect for Aerial Work
(27)
287.9
287.9
Deal after registering
Member discounted price
0% cash back
at checkout.
287.9
Non-PRO Account
287.9
Save
Non-PRO Account
In Stock.
Add to Cart
Quick look
VEVOR 3.8m Telescoping Ladder, Aluminum Lightweight Multi-Purpose Collapsible Extension, One-Touch Retraction Ladder, Heavy Duty 150kg Max Capacity with Non-Slip Feet, for Home, Outdoor Work, Loft
144.9
144.9
Deal after registering
Member discounted price
0% cash back
at checkout.
144.9
Non-PRO Account
144.9
Save
Non-PRO Account
In Stock.
Add to Cart
VEVOR Drywall Stilts, 45.7-76.2 cm Adjustable Aluminum Tool Stilts with Protective Knee Pads, Durable and Non-slip Work Stilts for Sheetrock Painting, Walking, Taping, Silver
(22)
156.9
156.9
Deal after registering
Member discounted price
0% cash back
at checkout.
156.9
Non-PRO Account
156.9
Save
Non-PRO Account
Almost sold out
Add to Cart
VEVOR Drywall Stilts, 24''-40'' Adjustable Aluminum Tool Stilts with Protective Knee Pads, Durable and Non-Slip Work Stilts for Sheetrock Painting, Walking, Taping, Silver
(22)
173.9
173.9
Deal after registering
Member discounted price
0% cash back
at checkout.
173.9
Non-PRO Account
173.9
Save
Non-PRO Account
Almost sold out
Add to Cart
Quick look
VEVOR Work Platform, 4 Gear Adjustable Height, Folding Alloy Steel Step Ladder, Portable Scaffolding Platform, 400 kg Load Capacity, Non-Slip Rubber Feet, Drywall Painting Stool, Cleaning & Washing
(2)
207.9
207.9
Deal after registering
Member discounted price
0% cash back
at checkout.
207.9
Non-PRO Account
207.9
Save
Non-PRO Account
Only 5 Left, order soon
Add to Cart
Quick look
VEVOR Multi-Purpose Folding Ladder, 7-in-1 Tall Step Ladder, A Frame 3 Step Adjustable Telescoping Ladder, 12ft Reach Height Heavy Duty Extension Ladder, 330 lbs Capacity for Household Outdoor Work
(3)
221.9
221.9
Deal after registering
Member discounted price
0% cash back
at checkout.
221.9
Non-PRO Account
221.9
Save
Non-PRO Account
Only 3 Left, order soon
Add to Cart
VEVOR Forklift Safety Cage, 635 kg Load Capacity, 114.3 x 109.2 cm Forklift Work Platform with Safety Harness & Lock, Drain Hole & Wheels & Tool Basket, Dual Nonslip Design Perfect for Aerial Work
(27)
662.9
662.9
Deal after registering
Member discounted price
0% cash back
at checkout.
662.9
Non-PRO Account
662.9
Save
Non-PRO Account
In Stock.
Add to Cart
Quick look
VEVOR Work Platform, 4 Gear Adjustable Height, Folding Alloy Steel Step Ladder, Portable Scaffolding Platform, 360 kg Load Capacity, Non-Slip Rubber Feet, Drywall Painting Stool, Cleaning & Washing
(2)
128.9
128.9
Deal after registering
Member discounted price
0% cash back
at checkout.
128.9
Non-PRO Account
128.9
Save
Non-PRO Account
Only 4 Left, order soon
Add to Cart
VEVOR Drywall Stilts, 61-101.6 cm Adjustable Aluminum Tool Stilts with Protective Knee Pads, Durable and Non-slip Work Stilts for Sheetrock Painting, Walking, Taping, Black
(22)
172.9
172.9
Deal after registering
Member discounted price
0% cash back
at checkout.
172.9
Non-PRO Account
172.9
Save
Non-PRO Account
In Stock.
Add to Cart
Quick look
VEVOR Multi-Purpose Folding Ladder, 7-in-1 Tall Extension Step Ladder, A Frame 4 Step Telescoping Ladder, 15.5ft Reach Height Heavy Duty Adjustable Ladder, 330 lbs Capacity for Home Outdoor
(3)
293.9
293.9
Deal after registering
Member discounted price
0% cash back
at checkout.
293.9
Non-PRO Account
293.9
Save
Non-PRO Account
Only 2 Left, order soon
Add to Cart
VEVOR Drywall Stilts, 91-127 cm Adjustable Aluminum Tool Stilts with Protective Knee Pads, Durable and Non-slip Work Stilts for Sheetrock Painting, Walking, Taping, Silver
(22)
193.9
193.9
Deal after registering
Member discounted price
0% cash back
at checkout.
193.9
Non-PRO Account
193.9
Save
Non-PRO Account
Only 1 Left, order soon
Add to Cart
New
Quick look
VEVOR Banding Strapping Kit, Heavy Duty A3 Steel Banding Sealer Tool with Adjustable Width, Manual Metal Pallet Packaging Strapping Kit for Warehouse, Transportation, Industrial Bundling, Home Use
199.9
229.9
Deal after registering
Member discounted price
0% cash back
at checkout.
199.9
Non-PRO Account
199.9
Save
Non-PRO Account
In Stock.
Add to Cart
Quick look
VEVOR Work Platform, 4 Gear Adjustable Height, Folding Alloy Steel Step Ladder, Portable Scaffolding Platform, 400 kg Load Capacity, Non-Slip Rubber Feet, Drywall Painting Stool, Cleaning & Washing
(2)
178.9
178.9
Deal after registering
Member discounted price
0% cash back
at checkout.
178.9
Non-PRO Account
178.9
Save
Non-PRO Account
Only 4 Left, order soon
Add to Cart
Quick look
VEVOR Telescoping Aluminum Work Plank, 8-13 Feet 500lbs Capacity, 12.5 inch Width Aluminum Scaffold Plank,Extension Staging Plank with Skid-Proof Platform Scaffold Ladder Accessory
(9)
277.9
327.99
Deal after registering
Member discounted price
0% cash back
at checkout.
277.9
Non-PRO Account
277.9
Save
Non-PRO Account
Out of Stock
View Details
Quick look
VEVOR Multi-Purpose Folding Ladder, 7-in-1 Tall Extension Step Ladder, A Frame 5 Step Telescoping Ladder, 19ft Reach Height Heavy Duty Adjustable Ladder, 330 lbs Capacity for Home Outdoor
(3)
344.9
344.99
Deal after registering
Member discounted price
0% cash back
at checkout.
344.9
Non-PRO Account
344.9
Save
Non-PRO Account
Out of Stock
Notify Me
Registered
Quick look
VEVOR Telescoping Aluminum Work Plank, 9-15 Feet 500lbs Capacity, 12.5 inch Width Aluminum Scaffold Plank,Extension Staging Plank with Skid-Proof Platform Scaffold Ladder Accessory
(9)
370.9
370.99
Deal after registering
Member discounted price
0% cash back
at checkout.
370.9
Non-PRO Account
370.9
Save
Non-PRO Account
Out of Stock
Notify Me
Registered
Quick look
VEVOR Multi-Purpose Folding Ladder, 7-in-1 Tall Extension Step Ladder, A Frame 5 Step Telescoping Ladder, 19ft Reach Height Heavy Duty Adjustable Ladder, 330 lbs Capacity for Home Outdoor Metal
(3)
417.9
342.99
Deal after registering
Member discounted price
0% cash back
at checkout.
417.9
Non-PRO Account
417.9
Save
Non-PRO Account
Out of Stock
Notify Me
Registered
Quick look
VEVOR Work Platform, 3 Gear Adjustable Height, Folding Alloy Steel Step Ladder, Portable Scaffolding Platform, 180 kg Load Capacity, Non-Slip Rubber Feet, Drywall Painting Stool, Cleaning & Washing
(2)
117.9
102.99
Deal after registering
Member discounted price
0% cash back
at checkout.
117.9
Non-PRO Account
117.9
Save
Non-PRO Account
Out of Stock
Notify Me
Registered
Quick look
VEVOR Steel Strapping Tool for 13-19 mm Width, 3-in-1 (Tensioner, Crimper, Cutter) Manual Belt Packaging Banding Machine Packaging Metal Steel Strapping Banding Tool Machine for Stainless Steel Strap
(1)
236.9
265.99
Deal after registering
Member discounted price
0% cash back
at checkout.
236.9
Non-PRO Account
236.9
Save
Non-PRO Account
Out of Stock
View Details
Quick look
VEVOR Steel Banding Strapping Kit, Heavy Duty Banding Sealer Tool with 30.5 m Binding Straps, 100 Metal Clasps, Manual Pallet Packaging Strapping Kit for Warehouse, Transportation, Industrial Bundling
120.99
120.99
Deal after registering
Member discounted price
0% cash back
at checkout.
120.99
Non-PRO Account
120.99
Save
Non-PRO Account
Out of Stock
Notify Me
Registered
Quick look
VEVOR Lifting Clamp 5T, Working Load Vertical Plate Clamp 0-30mm Jaw Opening, Industrial Steel Plate Clamp Sheet Metal Lifting Clamp Plate Lifting Clamp Handling Lifting Equipment
(15)
181.99
181.99
Deal after registering
Member discounted price
0% cash back
at checkout.
181.99
Non-PRO Account
181.99
Save
Non-PRO Account
Out of Stock
View Details
VEVOR Drywall Stilts, 61-101.6 cm Adjustable Aluminum Tool Stilts with Protective Knee Pads, Durable and Non-slip Work Stilts for Sheetrock Painting, Walking, Taping, Black
(22)
172.9
0% cash back
at checkout.
172.9
172.9
172.9
PRO Savings:
In Stock.
Add to Cart
1
You May Also Like
Today's Deals For You
Recently Viewed
Recommended Searches
heating and
heating & air
command strips for curtain rods
command hooks for curtain rods
plastic curtain strips
air curtain price
inflatable blowers
curtain heaters
air pros heating and cooling
air heating and cooling
precise heating and air
air tech heating and cooling
same day heating and air
comfort heating and air
heating and cooling near me
ac and heating service
ac and heating unit
roth's heating and cooling
heating and ac
heating ac