All
All
Appliances
Automotive
Bath
Building Materials
Cleaning
Doors & Windows
Electrical
Flooring
Furniture
Hardware
Health And Wellness
Heating, Venting & Cooling
Holiday Decorations
Home Decor
Industrial & Scientific
Kitchen
Lighting
Lumber & Composites
Musical Instruments
Other
Outdoors
Paint
Playground Sets
Plumbing
Safety Equipment
Smart Home
Sports & Outdoors
Storage & Organization
Tools
Window Treatments
Workwear
EN
Select the country/region, language, and currency you prefer for shopping.
Country Website
Language
Currency
Submit
Delivery to
Your Address
Hello, Sign in
Account & Order
Categories
Deals
New
Best Sellers
Clearance
Inspiration
Member Club
Download VEVOR App
Exclusive
AU $5.00
off for your first three orders on the App.
Scan the QR code to download
Home
Tools
Hand Tools
Search for "
safe work method statement
"
42 Results
Sort by:
Popular
Popular
Price from Low to High
Price from High to Low
Hot
New
Categories
Tools
Hand Tools
Clamps
Hand Tool Sets
Specialty Hand Tools
Cutting Tools
Taps & Dies
Tool Accessories
Measuring Tools
Wrenches
Fastening Tools
Price Discounts
On Sale
Bulk Savings
Stars
5 stars only
4 stars and up
3 stars and up
2 stars and up
1 star and up
Price
Go
Under
30
30
~
50
50
~
100
100
~
200
200
&
Above
In Stock
Pickup
Quick look
VEVOR Tap and Die Set, 116-Piece Include Metric and SAE Size, Bearing Steel Taps and Dies, Essential Threading Tool for Cutting External Internal Threads, with Complete Accessories and Storage Case
(79)
127.9
127.9
Deal after registering
Member discounted price
0% cash back
at checkout.
127.9
Non-PRO Account
127.9
Save
Non-PRO Account
In Stock.
Add to Cart
Quick look
VEVOR Bar Clamps for Woodworking, 2-Pack 914mm Clamp, Quick-Change F Clamp with 272KG Load Limit, 63.5mm Throat Depth, Cast Iron and Carbon Steel, Wood Clamps for Woodworking Metal Working
(108)
32.9
32.9
Deal after registering
Member discounted price
0% cash back
at checkout.
32.9
Non-PRO Account
32.9
Save
Non-PRO Account
In Stock.
Add to Cart
Quick look
VEVOR Bar Clamps for Woodworking, 4-Pack 91.4 cm Opening, Lockable F-Clamp with 272 kg Load Limit, 63.5 mm Depth, Cast Iron and Carbon Steel, Easy to Use, Wood Clamps for Woodworking Metal Working
(108)
67.9
67.9
Deal after registering
Member discounted price
0% cash back
at checkout.
67.9
Non-PRO Account
67.9
Save
Non-PRO Account
Only 5 Left, order soon
Add to Cart
Quick look
VEVOR Bar Clamps for Woodworking, 2-Pack 76.2 cm Parallel Clamp Set, F-Clamp with 680 kg Load Limit, Even Pressure, High-strength Plastic and Carbon Steel, for Woodworking Metal Working, Orange
(108)
113.9
113.9
Deal after registering
Member discounted price
0% cash back
at checkout.
113.9
Non-PRO Account
113.9
Save
Non-PRO Account
Almost sold out
Add to Cart
Quick look
VEVOR Bench Vise, 4.5 Inch, Portable Workbench Vice with 270° Swivel Base, Quick Release Rotating Bench Clamp, Cast Iron Construction, for Woodworking, Metalworking, Drilling, Sawing, Cutting Conduit
(1)
60.9
60.9
Deal after registering
Member discounted price
0% cash back
at checkout.
60.9
Non-PRO Account
60.9
Save
Non-PRO Account
Only 3 Left, order soon
Add to Cart
Quick look
VEVOR Bar Clamps for Woodworking, 2-Pack 30.48 cm and 2-Pack 15.24 cm, One-Handed Clamp/Spreader, Quick-Grip F-Clamp with 70 kg Load Limit, Premium Plastic and Steel, for Woodworking Metal working
(108)
37.9
37.9
Deal after registering
Member discounted price
0% cash back
at checkout.
37.9
Non-PRO Account
37.9
Save
Non-PRO Account
Almost sold out
Add to Cart
Quick look
VEVOR Drill Guide, Multi-Angle Press Portable Precision Drilling Guide Jig Attachment, with Large Handle and Mounting Holes, Aluminum Alloy, for Drilling Angled or Straight Holes, for Wood Working
(8)
40.9
40.9
Deal after registering
Member discounted price
0% cash back
at checkout.
40.9
Non-PRO Account
40.9
Save
Non-PRO Account
Only 5 Left, order soon
Add to Cart
Quick look
VEVOR Tap and Die Set, 80-Piece Metric and SAE Standard, Bearing Steel Taps and Dies, Essential Threading Tool for Cutting External Internal Threads, with Complete Accessories and Storage Case
(79)
70.9
70.9
Deal after registering
Member discounted price
0% cash back
at checkout.
70.9
Non-PRO Account
70.9
Save
Non-PRO Account
Only 4 Left, order soon
Add to Cart
Quick look
VEVOR 61-Piece Thread Chaser Set, UNC UNF and Metric Thread Restorer Tool, Rethreading Tool Kit with 28 Taps 28 Dies 3 Thread Files Storage Case, Heat Treated Steel, for Mechanics DIY Enthusiasts
89.9
89.9
Deal after registering
Member discounted price
0% cash back
at checkout.
89.9
Non-PRO Account
89.9
Save
Non-PRO Account
Only 2 Left, order soon
Add to Cart
Quick look
VEVOR Bar Clamps for Woodworking, 2-Pack 91.4 cm Parallel Clamp Set, F-Clamp with 680 kg Load Limit, Even Pressure, High-strength Plastic and Carbon Steel, for Woodworking Metal Working, Orange
(108)
120.9
120.9
Deal after registering
Member discounted price
0% cash back
at checkout.
120.9
Non-PRO Account
120.9
Save
Non-PRO Account
Only 2 Left, order soon
Add to Cart
Quick look
VEVOR Single Horn Anvil, 55lbs Cast Steel Anvil, High Hardness Rugged Round Horn Anvil for Blacksmiths, with Large Countertop and Stable Base, Metal Working Tool for Metal Bending, Shaping, Twisting
(2)
205.9
205.9
Deal after registering
Member discounted price
0% cash back
at checkout.
205.9
Non-PRO Account
205.9
Save
Non-PRO Account
Almost sold out
Add to Cart
Quick look
VEVOR Doweling Jig Kit, Self Centering Dowel Drill Jig for Straight Holes, Aluminum Alloy Woodworking Tools with 6 Drill Guide Bushings, Adjustable Width, for Wood Working, Drilling and Marking
(8)
38.9
38.9
Deal after registering
Member discounted price
0% cash back
at checkout.
38.9
Non-PRO Account
38.9
Save
Non-PRO Account
Only 2 Left, order soon
Add to Cart
Quick look
VEVOR Mechanics Tool Set and Socket Set, 1/4" and 3/8" Drive Deep and Standard Sockets, 145 Pcs SAE and Metric Mechanic Tool Kit with Bits, Combination Wrench, Hex Wrenches, Accessories, Storage Case
(46)
92.9
92.9
Deal after registering
Member discounted price
0% cash back
at checkout.
92.9
Non-PRO Account
92.9
Save
Non-PRO Account
In Stock.
Add to Cart
Quick look
VEVOR Single Horn Anvil, 25lbs Cast Steel Anvil, High Hardness Rugged Round Horn Anvil for Blacksmiths, with Stable Base, Metal Working Tool for Metal Bending, Shaping, Twisting, Craft Projects
(2)
68.9
68.9
Deal after registering
Member discounted price
0% cash back
at checkout.
68.9
Non-PRO Account
68.9
Save
Non-PRO Account
Only 1 Left, order soon
Add to Cart
Quick look
VEVOR Bar Clamps for Woodworking, 2-Pack 610 mm Opening, Lockable F-Clamp with 272 kg Load Limit, 63.5 mm Depth, Cast Iron and Carbon Steel, Easy to Use, Wood Clamps for Woodworking Metal Working
(108)
31.9
31.9
Deal after registering
Member discounted price
0% cash back
at checkout.
31.9
Non-PRO Account
31.9
Save
Non-PRO Account
Almost sold out
Add to Cart
Quick look
VEVOR 49-Piece Thread Chaser Set, UNC UNF and Metric Thread Restorer Tool, Rethreading Tool Kit with 22 Taps 24 Dies 3 Thread Files Storage Case, Heat Treated Steel, for Mechanics DIY Enthusiasts
69.9
69.9
Deal after registering
Member discounted price
0% cash back
at checkout.
69.9
Non-PRO Account
69.9
Save
Non-PRO Account
In Stock.
Add to Cart
Quick look
VEVOR Bar Clamps for Woodworking, 2-Pack 610mm One-Handed Clamp/Spreader, Quick-Change F Clamp with 300 lbs Load Limit, High-strength Plastic and Carbon Steel, Wood Clamps for Woodworking Metal Working
(108)
49.9
49.9
Deal after registering
Member discounted price
0% cash back
at checkout.
49.9
Non-PRO Account
49.9
Save
Non-PRO Account
In Stock.
Add to Cart
Quick look
VEVOR Bar Clamps for Woodworking, 2-Pack 15.24 cm and 2-Pack 30.48 cm, Lockable F-Clamp with 272 kg Load Limit, 63.5 mm Depth, Cast Iron and Carbon Steel, Wood Clamps for Woodworking Metal Working
(108)
39.99
39.99
Deal after registering
Member discounted price
0% cash back
at checkout.
39.99
Non-PRO Account
39.99
Save
Non-PRO Account
In Stock.
Add to Cart
Quick look
VEVOR Bar Clamps for Woodworking, 2-Pack 60.96 cm One-Handed Clamp/Spreader, Quick-Grip F-Clamp with 154 kg Load Limit, Premium Plastic and Carbon Steel, for Woodworking Metal working, Blue + Black
(108)
41.9
41.9
Deal after registering
Member discounted price
0% cash back
at checkout.
41.9
Non-PRO Account
41.9
Save
Non-PRO Account
In Stock.
Add to Cart
Quick look
VEVOR Doweling Jig Kit, Self Centering Dowel Drill Jig for Straight Holes, Aluminum Alloy Woodworking Joints Tool with 3 Size Drill Bits 6.4 / 7.9 / 15 mm, Adjustable Width, for Wood Working
(8)
42.9
42.9
Deal after registering
Member discounted price
0% cash back
at checkout.
42.9
Non-PRO Account
42.9
Save
Non-PRO Account
Only 3 Left, order soon
Add to Cart
Quick look
VEVOR 207-Piece Mechanics Tool Set, 1/4" 3/8" 1/2" Drive Sockets, SAE and Metric Mechanic Tool Kit with Bits, Wrenches, Ratchet Handle, Accessories, and Plastic Storage Case, for Automotive Repair
(3)
140.9
140.9
Deal after registering
Member discounted price
0% cash back
at checkout.
140.9
Non-PRO Account
140.9
Save
Non-PRO Account
Only 1 Left, order soon
Add to Cart
Quick look
VEVOR Bar Clamps for Woodworking, 2-Pack 91.4 cm Opening, Lockable F-Clamp with 272 kg Load Limit,63.5 mm Depth, Cast Iron and Carbon Steel, Easy to Use, Wood Clamps for Woodworking Metal Working
(108)
41.9
41.9
Deal after registering
Member discounted price
0% cash back
at checkout.
41.9
Non-PRO Account
41.9
Save
Non-PRO Account
Almost sold out
Add to Cart
Quick look
VEVOR Bar Clamps for Woodworking, 2-Pack 30.48 cm One-Handed Clamp/Spreader, Quick-Grip F-Clamp with 154 kg Load Limit, Premium Plastic and Carbon Steel, for Woodworking Metal working, Orange + Black
(108)
34.9
34.9
Deal after registering
Member discounted price
0% cash back
at checkout.
34.9
Non-PRO Account
34.9
Save
Non-PRO Account
Only 2 Left, order soon
Add to Cart
Quick look
VEVOR Torque Multiplier, Heavy Duty Torque Multiplier Wrench Set, 1 Inch Drive Lug Nut Wrench Torque Multiplier, 1:58 4800N.m Lug Nut Remover, with 4 Sockets and Storage Case for Truck Trailer RV
(36)
76.9
76.9
Deal after registering
Member discounted price
0% cash back
at checkout.
76.9
Non-PRO Account
76.9
Save
Non-PRO Account
In Stock.
Add to Cart
Quick look
VEVOR 221-Piece Mechanics Tool Set, 1/4" and 3/8" Drive Sockets, SAE and Metric Mechanic Tool Kit with Bits, Wrenches, Ratchet Handle, Accessories, and Plastic Storage Case, for Automotive Repair
(3)
84.9
88.9
Deal after registering
Member discounted price
0% cash back
at checkout.
84.9
Non-PRO Account
84.9
Save
Non-PRO Account
Only 5 Left, order soon
Add to Cart
Quick look
VEVOR 121-Piece Mechanics Tool Set, 1/4" 3/8" 1/2" Drive Sockets, SAE and Metric Mechanic Tool Kit with Bits, Wrenches, Ratchet Handle, Accessories, and Plastic Storage Case, for Automotive Repair
(3)
100.9
105.9
Deal after registering
Member discounted price
0% cash back
at checkout.
100.9
Non-PRO Account
100.9
Save
Non-PRO Account
Only 5 Left, order soon
Add to Cart
Quick look
VEVOR Mechanics Tool Set and Socket Set, 1/4" 3/8" 1/2" Drive Deep and Standard Sockets, 450 Pcs SAE and Metric Mechanic Tool Kit with Bits, Hex Wrenches, Combination Wrench, Accessories, Storage Case
(46)
187.9
224.99
Deal after registering
Member discounted price
0% cash back
at checkout.
187.9
Non-PRO Account
187.9
Save
Non-PRO Account
Out of Stock
View Details
Quick look
VEVOR Single Horn Anvil, 110lbs Cast Steel Anvil, High Hardness Rugged Round Horn Anvil for Blacksmiths, with Large Countertop and Stable Base, Metal Working Tool for Metal Bending, Shaping, Twisting
(2)
386.9
491.99
Deal after registering
Member discounted price
0% cash back
at checkout.
386.9
Non-PRO Account
386.9
Save
Non-PRO Account
Out of Stock
Notify Me
Registered
Quick look
VEVOR Survival Shovel, 11 in 1 Camping Shovel Folding Multitool, Military Grade Portable Compact Tactical Shovel, Multifunction for Off-Roading, Camping, Hiking, Outdoor, Survivalist and Emergency
39.9
35.99
Deal after registering
Member discounted price
0% cash back
at checkout.
39.9
Non-PRO Account
39.9
Save
Non-PRO Account
Out of Stock
View Details
Quick look
VEVOR Laser Receiver for Laser Level, 60 m Working Range, Green Laser and Red Beam Detector for Pulsing Line Lasers, Adjustable Speaker & Dual LCD Display & Built-In Bubble Level, Clamp Included
(2)
57.9
53.99
Deal after registering
Member discounted price
0% cash back
at checkout.
57.9
Non-PRO Account
57.9
Save
Non-PRO Account
Out of Stock
Notify Me
Registered
Quick look
VEVOR Bar Clamps for Woodworking, 2-Pack 60.96 cm Parallel Clamp Set, F-Clamp with 680 kg Load Limit, Even Pressure, High-strength Plastic and Carbon Steel, for Woodworking Metal Working, Orange
(108)
83.9
81.99
Deal after registering
Member discounted price
0% cash back
at checkout.
83.9
Non-PRO Account
83.9
Save
Non-PRO Account
Out of Stock
Notify Me
Registered
Quick look
VEVOR Mechanics Tool Set and Socket Set, 1/4" 3/8" 1/2" Drive Deep and Standard Sockets, 205 Pcs SAE and Metric Mechanic Tool Kit with Bits, Combination Wrench, Hex Wrenches, Accessories, Storage Case
(46)
121.9
146.99
Deal after registering
Member discounted price
0% cash back
at checkout.
121.9
Non-PRO Account
121.9
Save
Non-PRO Account
Out of Stock
View Details
Quick look
VEVOR Portable Socket Organizer Tray, 2PCS Metric & SAE Socket Organizer Set Hold up to 160 Sockets, 1/4", 3/8" and 1/2" Heavy-Duty Socket Rail with Handle & Steel Base for Tool Box Drawer
(1)
45.99
42.99
Deal after registering
Member discounted price
0% cash back
at checkout.
45.99
Non-PRO Account
45.99
Save
Non-PRO Account
Out of Stock
View Details
Quick look
VEVOR Survival Shovel Survival Axe, 16-in-1 Camping Folding Shovels with Hatchet, Stainless Steel Tactical Shovel Hatchet Combo, Multifunctional Emergency Survival Gear Equipment for Camping Hiking
(2)
67.9
70.99
Deal after registering
Member discounted price
0% cash back
at checkout.
67.9
Non-PRO Account
67.9
Save
Non-PRO Account
Out of Stock
View Details
Quick look
VEVOR 7-Piece Thread Chaser Set, Metric Thread Restorer Tool M10 M12 M14 M18 M20 M22, Rethreading Tool Kit with Storage Case, Heat Treated Carbon Steel, for Automotive Thread Repair Applications
47.9
60.99
Deal after registering
Member discounted price
0% cash back
at checkout.
47.9
Non-PRO Account
47.9
Save
Non-PRO Account
Out of Stock
View Details
Quick look
VEVOR Tool Kit, 216 Piece General Household Hand Tool Set, Home Repairing Tool Kit with Portable Tool Storage Case, High-Quality Steel, for Home Maintenance, DIY Projects, and Automotive Repair
(4)
103.99
112.99
Deal after registering
Member discounted price
0% cash back
at checkout.
103.99
Non-PRO Account
103.99
Save
Non-PRO Account
Out of Stock
View Details
Quick look
VEVOR Survival Shovel, 8 in 1 Camping Shovel Folding Multitool, Military Grade Portable Compact Tactical Shovel, Multifunction for Off-Roading, Camping, Hiking, Outdoor, Survivalist and Emergency
31.9
28.99
Deal after registering
Member discounted price
0% cash back
at checkout.
31.9
Non-PRO Account
31.9
Save
Non-PRO Account
Out of Stock
View Details
Quick look
VEVOR Single Horn Anvil 132Lbs Cast Steel Anvil Blacksmith for Sale Forge Steel Tools with Round and Square Hole and Equipment Anvil Rugged Blacksmith Jewelers Durable and Robust Metal Working Tool
(382)
449.9
605.99
Deal after registering
Member discounted price
0% cash back
at checkout.
449.9
Non-PRO Account
449.9
Save
Non-PRO Account
Out of Stock
View Details
Quick look
VEVOR Socket Set, 46 Pieces, 6.4 mm Drive Socket Tool Set, SAE and Metric Size, Deep and Standard, Mechanic Tool Kit with Storage Case, Chrome Plated CR-V Alloy Steel, for Automotive Repair
(2)
29.9
33.99
Deal after registering
Member discounted price
0% cash back
at checkout.
29.9
Non-PRO Account
29.9
Save
Non-PRO Account
Out of Stock
Notify Me
Registered
Quick look
VEVOR Survival Shovel Survival Axe, 28-in-1 Camping Folding Shovels with Hatchet, Stainless Steel Tactical Shovel Hatchet Combo, Multifunctional Emergency Survival Gear Equipment for Camping Hiking
(2)
90.9
97.99
Deal after registering
Member discounted price
0% cash back
at checkout.
90.9
Non-PRO Account
90.9
Save
Non-PRO Account
Out of Stock
View Details
Quick look
VEVOR Survival Shovel, 13 in 1 Camping Shovel Folding Multitool, Military Grade Portable Compact Tactical Shovel, Multifunction for Off-Roading, Camping, Hiking, Outdoor, Survivalist and Emergency
40.9
43.99
Deal after registering
Member discounted price
0% cash back
at checkout.
40.9
Non-PRO Account
40.9
Save
Non-PRO Account
Out of Stock
View Details
Quick look
VEVOR Single Horn Anvil 86Lbs Steel Anvil Blacksmith for Sale Forge Steel Tools and Equipment Anvil Rugged Blacksmith Jewelers Durable and Robust Metal Working Tool
(382)
285.9
337.99
Deal after registering
Member discounted price
0% cash back
at checkout.
285.9
Non-PRO Account
285.9
Save
Non-PRO Account
Out of Stock
Notify Me
Registered
1
You May Also Like
Today's Deals For You
Recently Viewed
Recommended Searches
torque socket set
socket bit for drill
axle nut socket set
socket sets 3 8
drill sockets
few tools
tool come along
my tools
tools machine
used tools
tools near me
second hand machine
tool machining
must have tools
tools for machines
machine tools machining
when tools
steel cutter tool
strapping tool set
manual brake bleeder tool