All
All
Sports & Recreation
Health & Wellness
Meat Choppers & Meat Grinders
Decor & Furniture
Pet Supplies
Home Decor
Decor & Furniture
Doors & Windows
Agriculture & Forestry Equipment
Air Tools & Compressors
Alternative & Renewable Energy
Arts & Crafts & Sewing
Automotive
Building & Construction
Cleaning & Janitorial Supplies
Electrical
Engines & Motors
Hand Tools
Hardware
Heating & Cooling
Hydraulics
Lab
Lawn & Garden
Lighting
Machining
Material Handling
Office Supplies
Painting
Plumbing
Power Tools
Pumps
Restaurant & Food Service
Safety
Security
Tool Storage & Organization
Welding
Other
EN
Select the country/region, language, and currency you prefer for shopping.
Country Website
Language
Currency
Submit
Delivery to
Your Address
Hello, Sign in
Account & Order
Categories
Deals
Best Sellers
Clearance
Member Club
Inspiration
Download VEVOR App
Exclusive
AU $5.00
off for your first three orders on the App.
Scan the QR code to download
Home
Office Supplies
Search for "
safe work method statement
"
Office Furniture
Furniture
19 Results
Sort by:
Popular
Popular
Price from Low to High
Price from High to Low
Hot
New
Categories
Office Supplies
Office Furniture
Furniture
Price Discounts
On Sale
Bulk Savings
Stars
5 stars only
4 stars and up
3 stars and up
2 stars and up
1 star and up
Price
Go
Under
30
30
~
50
50
~
100
100
~
200
200
~
500
500
&
Above
In Stock
Quick look
VEVOR Saddle Rolling Stool, PU Leather Rolling Stool with Wheels, 360° Swivel Drafting Stool with Thickened Cushion, Height Adjustable Rolling Work SPA Stool, for Office, Home, Salon & Bar, White
(11)
100.99
100.99
Deal after registering
Member discounted price
0% cash back
at checkout.
100.99
Non-PRO Account
100.99
Save
Non-PRO Account
Almost sold out
Add to Cart
Quick look
VEVOR Saddle Rolling Stool, PU Leather Rolling Stool with Wheels, 360° Swivel Drafting Stool with Thickened Cushion, Height Adjustable Rolling Work SPA Stool, for Office, Home, Salon & Bar, Black
(11)
91.99
91.99
Deal after registering
Member discounted price
0% cash back
at checkout.
91.99
Non-PRO Account
91.99
Save
Non-PRO Account
In Stock.
Add to Cart
Quick look
VEVOR Executive Chair, High Back Office Chair with Knob-Control Lumbar Support, Ergonomic Desk Chair Adjustable Tilt & Height, PU Leather Swivel Rolling Chair for Working, Study, Gaming, Black
(1)
391.99
391.99
Deal after registering
Member discounted price
0% cash back
at checkout.
391.99
Non-PRO Account
391.99
Save
Non-PRO Account
Only 2 Left, order soon
Add to Cart
Quick look
VEVOR Round Rolling Stool, PU Leather Rolling Stool with Backrest, 360° Swivel Drafting Stool with Thickened Cushion, Height Adjustable Rolling Work SPA Stool, for Office, Home, Salon & Bar, Black
(4)
110.99
110.99
Deal after registering
Member discounted price
0% cash back
at checkout.
110.99
Non-PRO Account
110.99
Save
Non-PRO Account
Almost sold out
Add to Cart
Quick look
VEVOR Reading Pillow, Lap Desk Pillow with Washable Cloth, Large Bed Pillow with 2 Pockets and Cup Holder, Memory Foam Bed Rest for Reading, Gaming, Resting, Working, Grey
51.99
51.99
Deal after registering
Member discounted price
0% cash back
at checkout.
51.99
Non-PRO Account
51.99
Save
Non-PRO Account
Only 4 Left, order soon
Add to Cart
Quick look
VEVOR Round Rolling Stool, Leather Rolling Stool with Wheels, 360° Swivel Drafting Stool with Thickened Cushion, Height Adjustable Rolling Work SPA Tattoo Stool, for Office, Home, Salon & Bar, Black
(4)
84.99
84.99
Deal after registering
Member discounted price
0% cash back
at checkout.
84.99
Non-PRO Account
84.99
Save
Non-PRO Account
In Stock.
Add to Cart
Quick look
VEVOR Executive Chair, High Back Office Chair with Flip-up Armrests & Lumbar Support, Ergonomic Desk Chair Adjustable Tilt & Height, PU Leather Swivel Rolling Chair for Working, Study, Gaming, Black
(1)
230.99
230.99
Deal after registering
Member discounted price
0% cash back
at checkout.
230.99
Non-PRO Account
230.99
Save
Non-PRO Account
Only 2 Left, order soon
Add to Cart
Quick look
VEVOR Headboard Pillow, King Size Wedge Headboard Pillow with 2 Side Pockets and 2 Headrests, Bed Wedge Pillow with Washable Flannel Cloth, for Reading, Gaming, Resting, Working in Bed, Grey
103.99
103.99
Deal after registering
Member discounted price
0% cash back
at checkout.
103.99
Non-PRO Account
103.99
Save
Non-PRO Account
Only 5 Left, order soon
Add to Cart
Quick look
VEVOR Keyboard Tray under Desk Adjustable Height, Height and Angle Adjustable under Desk Keyboard Tray Slide out, Large 25x9.8 inch Keyboard Holder under Desk for Typing in Home, Office Work
77.99
77.99
Deal after registering
Member discounted price
0% cash back
at checkout.
77.99
Non-PRO Account
77.99
Save
Non-PRO Account
In Stock.
Add to Cart
Quick look
VEVOR Round Rolling Stool, Leather Rolling Stool with Wheels, 360° Swivel Drafting Stool with Thickened Cushion, Height Adjustable Rolling Work SPA Tattoo Stool, for Office, Home, Salon & Bar, White
(4)
76.99
76.99
Deal after registering
Member discounted price
0% cash back
at checkout.
76.99
Non-PRO Account
76.99
Save
Non-PRO Account
Only 4 Left, order soon
Add to Cart
Quick look
VEVOR Executive Chair, High Back Office Chair with Footrest and Lumbar Pillow, Ergonomic Desk Chair 135° Recline & Adjustable Height, PU Leather Swivel Rolling Chair for Work, Study, Game, Black
(1)
243.9
245.99
Deal after registering
Member discounted price
0% cash back
at checkout.
243.9
Non-PRO Account
243.9
Save
Non-PRO Account
Almost sold out
Add to Cart
Quick look
VEVOR Executive Office Chair, High Back Chair with Footrest and Removable Armrests, Ergonomic Desk Chair High-Resilience Foam Cushion, PU Leather Swivel Rolling Chair for Work, Study, Game, Black
(1)
511.99
511.99
Deal after registering
Member discounted price
0% cash back
at checkout.
511.99
Non-PRO Account
511.99
Save
Non-PRO Account
Only 1 Left, order soon
Add to Cart
Quick look
VEVOR Executive Office Chair, High Back Chair with Footrest and Lumbar Pillow, Ergonomic Desk Chair 135° Recline & Adjustable Height, PU Leather Swivel Rolling Chair for Work, Study, Game, Black
(1)
306.99
306.99
Deal after registering
Member discounted price
0% cash back
at checkout.
306.99
Non-PRO Account
306.99
Save
Non-PRO Account
Only 5 Left, order soon
Add to Cart
Quick look
VEVOR Headboard Pillow, Queen Size Wedge Headboard Pillow with 2 Side Pockets and 2 Headrests, Bed Wedge Pillow with Washable Flannel Cloth, for Reading, Gaming, Resting, Working in Bed, Grey
71.99
71.99
Deal after registering
Member discounted price
0% cash back
at checkout.
71.99
Non-PRO Account
71.99
Save
Non-PRO Account
Only 4 Left, order soon
Add to Cart
Quick look
VEVOR Round Rolling Stool, Leather Rolling Stool with Footrest, 360° Swivel Drafting Stool with Thickened Cushion, Height Adjustable Rolling Work SPA Tattoo Stool, for Office, Home, Salon & Bar Black
(4)
105.99
105.99
Deal after registering
Member discounted price
0% cash back
at checkout.
105.99
Non-PRO Account
105.99
Save
Non-PRO Account
Only 3 Left, order soon
Add to Cart
Quick look
VEVOR Reading Pillow, Backrest Support Pillow with Arm and 3 Pockets, Large Size Bed Pillow with Removable Headrest & 25D Sponge, Handle for Easy Carrying, for Reading, Gaming, Resting, Working, Grey
59.99
59.99
Deal after registering
Member discounted price
0% cash back
at checkout.
59.99
Non-PRO Account
59.99
Save
Non-PRO Account
Almost sold out
Add to Cart
Quick look
VEVOR Saddle Rolling Stool, PU Leather Rolling Stool with Backrest, 360° Swivel Drafting Stool with Thickened Cushion, Height Adjustable Rolling Work SPA Stool, for Office, Home, Salon & Bar, Black
(11)
118.99
131.99
Deal after registering
Member discounted price
0% cash back
at checkout.
118.99
Non-PRO Account
118.99
Save
Non-PRO Account
Out of Stock
Notify Me
Registered
Quick look
VEVOR Reading Pillow, Large Size U-Shaped Sitting up Pillow, Washable Bed Pillow with Soft Velvet, Bed Rest Back Pillow, Ideal for Reading, Gaming, Resting, Working, Grey
50.99
50.99
Deal after registering
Member discounted price
0% cash back
at checkout.
50.99
Non-PRO Account
50.99
Save
Non-PRO Account
Out of Stock
Notify Me
Registered
Quick look
VEVOR Clamp on Keyboard Tray Under Desk, Desk Keyboard Tray Slide out with Sturdy No-drill C Clamp Mount, Large 26.8 x 11 inch Slide-out Computer Drawer for Typing in Home, Office Work
75.99
75.99
Deal after registering
Member discounted price
0% cash back
at checkout.
75.99
Non-PRO Account
75.99
Save
Non-PRO Account
Out of Stock
Notify Me
Registered
1
You May Also Like
Today's Deals For You
Recently Viewed
Recommended Searches
boxing
garage storage cabinet with doors
drawers for cabinets
office reception table
hallway cabinet
used office table
best office table
outdoor restaurant furniture
bronze cabinet knobs
chrome cabinet knobs
modern cabinet knobs
bathroom cabinet knobs
glass cabinet knobs
workbench table
wood cabinet knobs
steel work table
kitchen cabinet handles
cabinet knobs
old desk
used desk